Katalog Buku

KP - PROSES ADJUSMENT CABLE NOSE WHEEL STEERING SYSTEM PADA PESAWAT BOEING 737 300 PT AERO NUSANTARA INDONESIA
KP - PROSES PERBAIKAN KEBOCORAN INNER LEADING EDGE WING DE-ICER RUBBER BOOT PADA PESAWAT DORNIER-328-100 TURBO PROPELLER MENGGUNAKAN BONDED PATCH BASE MAINTENANCE PT. AERO NUSANTARA INDONESIA (ANI)
KP - DI SKADRON TEKNIK 043 MEASUREMENT FLOW RATE FUEL NOZZLE MENGGUNAKAN BENCH TEST PADA MESIN ROLL ROYCE 250-B17F PESAWAT GROB G 120TP-A
KP - PERAWATAN BATERAI UTAMA BOEING 737 – 900 ER DI PT GMF AEROASIA Tbk.
KP - TRIM ANALYSIS PADA PESAWAT SINGLE ENGINE DENGAN VARIASI LOAD FACTOR DI DEPARTEMEN LOAD BIDANG LOAD ANALYSIS (TC 3000) PT. DIRGANTARA INDONESIA (IAe)
KP - PERAWATAN IGNITION SYSTEM ENGINE ROLLS-ROYCE PESAWAT GROB G 120TP-A DI SKADRON TEKNIK 043 LANUD ADISUTJIPTO YOGYAKARTA
KP - PELEPASAN DAN PEMASANGAN THRUST REVERSER VOLUMETRIC HYDRAULIC FUSE PADA PESAWAT BOEING 737-400 BASE MAINTENANCE PT. AERO NUSANTARA INDONESIA (ANI)
KP - PT. ASI PUDJIASTUTI AVIATION NONDESTRUCTIVE TESTING (NDT) PADA BAGIAN WELDING ENGINE TRUSS DENGAN MENGGUNAKAN METODE MAGNETIC PARTICLE INSPECTION (MPI) PESAWAT CESSNA 208B CARAVAN
KP - PELEPASAN DAN PEMASANGAN PRECOOLER CONTROL VALVE PESAWAT BOEING 737-800 NG DIKARENAKAN BLEED TRIP OFF LIGHT ON
KP - INSPEKSI 200 HOURS PADA ELEVATOR SYSTEM CESSNA GRAND CARAVAN C208B DI PT. ASI PUDJIASTUTI AVIATION